International Panel on Fissile Materials

Fostering initiatives to reduce stocks and end the production and use of highly enriched uranium and plutonium

  • Home
  • IPFM Blog
  • Publications
  • Library
  • About IPFM
  • Home
  • August 2020 Archives

IPFM Blog

Archive: August 2020

  1. August 21, 2020 Status of plutonium management in Japan in 2019
  2. August 21, 2020 Launch of the Rokkasho reprocessing plant is postponed until 2022
  3. August 12, 2020 UK Sellafield Magnox Reprocessing Plant to close in 2021, one year later than planned
  • June 2020
  • September 2020

Subscribe

  • IPFM Blog feed
  • IPFM on Twitter
  • IPFM on Facebook

Categories

  • Fissile material cutoff and elimination (60)
  • Disarmament and transparency (30)
  • Spent fuel management (87)
  • Fast breeder reactors (45)
  • Civilian nuclear industry (373)
  • Weapons complex (143)
  • HEU minimization (254)
  • IPFM news and publications (47)
  • Reprocessing (83)

Archives

Top Tags (See All)

  • Areva
  • back end
  • Belgium
  • Canada
  • centrifuges
  • China
  • DoE
  • enrichment
  • enrichment services
  • fast reactors
  • France
  • front end
  • Germany
  • GTRI
  • HEU
  • HEU cleanout
  • HEU fuel
  • IAEA
  • India
  • INFCIRC/549
  • IPFM
  • isotope production
  • Japan
  • Kazakhstan
  • MFFF
  • molybdenum
  • MOX
  • naval reactors
  • NNSA
  • NRC
  • plutonium
  • plutonium disposition
  • power reactors
  • reactor conversion
  • reactor-grade plutonium
  • reprocessing
  • research reactors
  • Rosatom
  • Russia
  • Savannah River Site
  • spent fuel management
  • spent fuel takeback
  • The Netherlands
  • United Kingdom
  • United States
  • uranium
  • VVR reactors
  • weapon materials
  • weapon-grade plutonium
  • Zheleznogorsk
  • Home
  • IPFM Blog
  • Publications
  • Library
  • About IPFM

© Copyright 2024.

Powered by Movable Type Pro