International Panel on Fissile Materials

Fostering initiatives to reduce stocks and end the production and use of highly enriched uranium and plutonium

  • Home
  • IPFM Blog
  • Publications
  • Library
  • About IPFM
  • Home
  • March 2013 Archives

IPFM Blog

Archive: March 2013

  1. March 29, 2013 Areva launches commercial production at Georges Besse II North enrichment plant
  2. March 20, 2013 The cost of the U.S. MOX plant is estimated to be $7.7 billion
  3. March 20, 2013 Dutch spent fuel arrived for reprocessing at La Hague
  • February 2013
  • April 2013

Subscribe

  • IPFM Blog feed
  • IPFM on Twitter
  • IPFM on Facebook

Categories

  • Fissile material cutoff and elimination (60)
  • Disarmament and transparency (30)
  • Spent fuel management (87)
  • Fast breeder reactors (45)
  • Civilian nuclear industry (373)
  • Weapons complex (143)
  • HEU minimization (254)
  • IPFM news and publications (47)
  • Reprocessing (83)

Archives

Top Tags (See All)

  • Areva
  • back end
  • Belgium
  • Canada
  • centrifuges
  • China
  • DoE
  • enrichment
  • enrichment services
  • fast reactors
  • France
  • front end
  • Germany
  • GTRI
  • HEU
  • HEU cleanout
  • HEU fuel
  • IAEA
  • India
  • INFCIRC/549
  • IPFM
  • isotope production
  • Japan
  • Kazakhstan
  • MFFF
  • molybdenum
  • MOX
  • naval reactors
  • NNSA
  • NRC
  • plutonium
  • plutonium disposition
  • power reactors
  • reactor conversion
  • reactor-grade plutonium
  • reprocessing
  • research reactors
  • Rosatom
  • Russia
  • Savannah River Site
  • spent fuel management
  • spent fuel takeback
  • The Netherlands
  • United Kingdom
  • United States
  • uranium
  • VVR reactors
  • weapon materials
  • weapon-grade plutonium
  • Zheleznogorsk
  • Home
  • IPFM Blog
  • Publications
  • Library
  • About IPFM

© Copyright 2024.

Powered by Movable Type Pro